NDI
clip -36
clip -28_edited
clip -29_edited
created by dji camera
magazyn stali 2 suwnice_edited_edited
DCIM101MEDIADJI_0055.JPG
previous arrowprevious arrow
next arrownext arrow

Warehousing

Warehousing

Intermodal Terminal

Intermodal Terminal

Railway Transport

Railway Transport

Road Transport

Road Transport

NEWS FROM CLIP GROUP S.A.

NEWS

See more news…

INTERMODAL CONNECTIONS CLIP GROUP S.A.

CONNECTION MAP

The map presents implemented
and planned intermodal connections of CLIP Group S.A.

CLIP GROUP S.A. train timetable.

TRAIN TIMETABLE

EXPANSION OF THE CLIP TERMINAL

HALFWAY POINT OF THE EXPANSION OF THE CLIP INTERMODAL TERMINAL

Work is underway to expand the CLIP Intermodal Terminal. Currently, during the day there are arms works, and at night, due to the lower temperature, concreting. Three kilometres of track, a western interchange head and about 60% of the set-up plate have already been made. The remaining eastern interchange head, track number 601, along the E-20 line and the rest of the set-up plate remain to be made.

ASSEMBLY OF cRANES OF THE CLIP TERMINAL

INSTALLATION OF THE CRANES AT THE CLIP TERMINAL

RMG cranes erected.

The process of their lifting at the CLIP Intermodal Terminal has just finished. It was the first operation of this type in Europe. CLIP cranes are the largest in Poland and the EU inland terminals. Their impressive width of 100 meters will allow the handling of 24 trains with containers a day. The mass of the assembled cranes is 2000 tons. The cranes will be powered by electricity coming 100% from renewable energy sources.